Residents of Raja Street, Mandaveli, were taken aback when foam started oozing out of the TANGEDCO power supply meter in one of the apartment buildings. This unexpected event has left the community alarmed, raising concerns about the ongoing Chennai Metro construction work in the area.
The Impact of Chennai Metro Construction
The residents of Raja Street are facing numerous challenges as a result of the Chennai Metro construction activities. One resident shared their ordeal, highlighting the significant disruptions caused by the ongoing work. The complete drainage blockage due to grouting work has led to the mixing of sewage with drainage water, compounding the existing problems.
Unexpected Foam Outburst
The situation took a hazardous turn when, at approximately 10:45 pm, chemical foam erupted from an apartment sewage line, further intensifying the residents’ distress. Despite the gravity of the situation, the response from Metro officials has been inadequate, leaving the residents frustrated and anxious about their safety.
Structural Concerns
In addition to the drainage issues, residents have also noticed new cracks developing in some buildings, raising serious concerns about the structural integrity of their homes. The mounting stress and uncertainty among the residents have prompted calls for urgent action from the authorities.
Seeking Answers from Chennai Metro
The local residents’ association has demanded a meeting with a senior officer from Chennai Metro to address their pressing concerns and provide clarity on the situation. The residents are seeking answers and solutions to alleviate the challenges posed by the ongoing construction work.
Grouting Work Under Scrutiny
Grouting work has been underway in the Mandaveli area since late December 2023, aimed at addressing soil instability issues encountered during tunneling work on the Greenways Road – Mandaveli line. However, the adverse effects of this work, including drainage blockages and structural damage, have significantly impacted the lives of the residents.
As the residents of Raja Street continue to grapple with the consequences of the Chennai Metro construction activities, there is an urgent need for swift action and effective communication from the authorities to address their concerns and ensure their safety and well-being.